Overdevelopment, abandonment, conflict and renewal: engineering measures and urban planning turn the depleted Haizhou open-pit coal mine in Fuxin into a park for the city.

Haizhou open-pit coal mine, Fuxin, Liaoning | Urban design | Individual work | Sep 2022–Nov 2023 | Student Project | Design Mentor: Yu Chun Tsai

過度開發、廢棄、衝突與更新:以工程措施結合都市計畫,將枯竭的阜新海州露天煤礦轉化為城市公園。

遼寧阜新海州露天煤礦|城市設計|個人作品|2022 年 9 月–2023 年 11 月|學生作品|Yu Chun Tsai 設計指導

过度开发、废弃、冲突与更新:以工程措施结合都市计划,将枯竭的阜新海州露天煤矿转化为城市公园。

辽宁阜新海州露天煤矿|城市设计|个人作品|2022 年 9 月–2023 年 11 月|学生作品|Yu Chun Tsai 设计指导

Master plan: the Haizhou pit turned into a park, with a lake at the bottom, greenhouses, trails and viewing points on its slopes.
總平面:海州礦坑化為公園,坑底是湖泊,坡面上有溫室、步道與觀景點。
总平面:海州矿坑化为公园,坑底是湖泊,坡面上有温室、步道与观景点。

Problem

問題

问题

Fuxin's coal mining history began in 1897, and the Haizhou open-pit coal mine, the largest in Asia, produced 210 million tons of coal from 1953 to 2003. Resource depletion then led to bankruptcy and the loss of tourism, specialty products, industry and talented people, and a national mine park planned since 2005 only completed its entrance plaza and museum before it was deserted.

阜新的煤礦開採史始於 1897 年;亞洲最大的海州露天煤礦在 1953 至 2003 年間產出 2.1 億噸煤。資源枯竭隨後導致破產,觀光、特產、產業與人才也隨之流失;2005 年起規劃的國家礦山公園,只完成了入口廣場與博物館便遭廢棄。

阜新的煤矿开采史始于 1897 年;亚洲最大的海州露天煤矿在 1953 至 2003 年间产出 2.1 亿吨煤。资源枯竭随后导致破产,观光、特产、产业与人才也随之流失;2005 年起规划的国家矿山公园,只完成了入口广场与博物馆便遭废弃。

The open-pit mine is a 10-minute drive from downtown Fuxin, beside the thermal power station, residences and the railway station.
露天礦坑距阜新市中心僅 10 分鐘車程,緊鄰熱電廠、住宅區與火車站。
露天矿坑距阜新市中心仅 10 分钟车程,紧邻热电厂、住宅区与火车站。

Research

研究

研究

A field survey of the pit recorded gangue rock piled up, unstable soil and loose stones, water unable to drain and raised sand and dust. South of the pit a huge power station and a great amount of gangue show the monolithic nature of the pit economy's industry.

對礦坑的實地調查記錄了矸石堆積、土壤不穩與碎石鬆動、排水不良,以及揚沙揚塵等問題。礦坑南側巨大的電廠與大量的矸石,顯示礦坑經濟產業的單一性。

对矿坑的实地调查记录了矸石堆积、土壤不稳与碎石松动、排水不良,以及扬沙扬尘等问题。矿坑南侧巨大的电厂与大量的矸石,显示矿坑经济产业的单一性。

Field survey on mining pits: site issues and current situation, with boundary sections I and II.
礦坑實地調查:基地問題與現況,以及邊界剖面一與二。
矿坑实地调查:基地问题与现况,以及边界剖面一与二。

Development

推演

推演

Three engineering measures support the expectations for the pit: a water system that forms a lake at its bottom in coordination with existing plans for a pumped storage power plant, light timber piles that use gravity to repair the stability of the slope, and the recycling of coal gangue. The gangue is sorted and converted into building materials for pit rehabilitation and into fertilizers for plant growth.

三項工程措施支撐礦坑的願景:配合既有抽水蓄能電廠計畫、在坑底形成湖泊的水系統;以重力修復坡面穩定的輕型木樁;以及煤矸石的回收再利用。矸石經過分類,轉化為礦坑修復用的建材與植物生長所需的肥料。

三项工程措施支撑矿坑的愿景:配合既有抽水蓄能电厂计划、在坑底形成湖泊的水系统;以重力修复坡面稳定的轻型木桩;以及煤矸石的回收再利用。矸石经过分类,转化为矿坑修复用的建材与植物生长所需的肥料。

Foundation: the engineering measures on a model of the pit.
基礎:工程措施在礦坑模型上的配置。
基础:工程措施在矿坑模型上的配置。
Waste recycling system: the process of thinking for coal gangue.
廢料回收系統:煤矸石的思考流程。
废料回收系统:煤矸石的思考流程。
Light structural facility system and the four-step light structural experiment.
輕型結構設施系統與四步驟的輕型結構實驗。
轻型结构设施系统与四步骤的轻型结构实验。

Outcome

成果

成果

By reducing the gradient of the north slope that connects to the city and installing parks, green belts and rest and activity facilities, the pit opens up to the city and takes on public service, recreational and tourism value. Combined with urban planning, these strategies aim to revitalize the open-pit mine and transform it into a thriving urban centre once more.

透過降低連接城市的北坡坡度,並設置公園、綠帶與休憩活動設施,礦坑向城市敞開,承擔公共服務、休閒與觀光的價值。這些策略結合都市計畫,目標是讓露天礦坑重獲生機,再次成為繁榮的城市中心。

通过降低连接城市的北坡坡度,并设置公园、绿带与休憩活动设施,矿坑向城市敞开,承担公共服务、休闲与观光的价值。这些策略结合都市计划,目标是让露天矿坑重获生机,再次成为繁荣的城市中心。

Development of the pit: connecting with the city, functional zoning and flow plan, and the connection method diagram.
礦坑的發展:與城市連結、機能分區與動線計畫,以及連接方式示意圖。
矿坑的发展:与城市连接、机能分区与动线计划,以及连接方式示意图。
Renderings: the centre lake and observation tower, outdoor adventure, the forest trail and the centre greenhouse platform.
透視圖:中央湖泊與觀景塔、戶外探險、森林步道與中央溫室平台。
透视图:中央湖泊与观景塔、户外探险、森林步道与中央温室平台。

New Life in the Pit - Opening an Exhausted Coal Mine to Its City

礦坑新生-讓枯竭的露天煤礦向城市敞開

矿坑新生-让枯竭的露天煤矿向城市敞开

A coal city has been mining for more than a century, and the largest open-pit mine in Asia yielded over two hundred million tons of coal in half a century. When the resource ran out the mine went bankrupt, tourism, local products, industry and talent drained away, and a long-planned mine park was abandoned with only its entrance plaza and museum built. A field survey recorded piled gangue, unstable soil and loose stones, water that cannot drain, while a huge power station and mountains of gangue to the south show how narrow the pit economy was. Three engineering measures hold up the future of the pit: a water system that forms a lake at its bottom alongside planned pumped storage power, light timber piles that use gravity to steady the slopes, and the recycling of gangue. Sorted gangue becomes building material for the repair and fertiliser for new planting. By easing the north slope toward the city and adding parks, green belts and places to rest and play, the pit opens to the city, and with urban planning it can become a thriving centre once more.

一座煤礦城市的開採史已逾百年,亞洲最大的露天煤礦在半世紀間產出兩億多噸煤;資源枯竭之後,礦場破產,觀光、特產、產業與人才相繼流失,規劃多年的礦山公園只完成入口廣場與博物館便遭荒廢。實地調查記錄了矸石堆積、土壤不穩、排水不良與揚沙揚塵;礦坑南側的巨大電廠與成山的矸石,透露出礦坑經濟的單一。三項工程措施支撐礦坑的未來:配合既有的抽水蓄能電廠計畫,在坑底形成湖泊的水系統;以重力修復坡面穩定的輕型木樁;以及煤矸石的回收再利用。矸石經分類後,轉化為修復礦坑的建材與滋養植物的肥料。降低連接城市的北坡坡度,並設置公園、綠帶與休憩活動設施後,礦坑向城市敞開,承擔公共服務、休閒與觀光的價值。結合都市計畫,這些策略讓沉寂的巨坑重新成為城市的心臟。

一座煤矿城市的开采史已逾百年,亚洲最大的露天煤矿在半世纪间产出两亿多吨煤;资源枯竭之后,矿场破产,观光、特产、产业与人才相继流失,规划多年的矿山公园只完成入口广场与博物馆便遭荒废。实地调查记录了矸石堆积、土壤不稳、排水不良与扬沙扬尘;矿坑南侧的巨大电厂与成山的矸石,透露出矿坑经济的单一。三项工程措施支撑矿坑的未来:配合既有的抽水蓄能电厂计划,在坑底形成湖泊的水系统;以重力修复坡面稳定的轻型木桩;以及煤矸石的回收再利用。矸石经分类后,转化为修复矿坑的建材与滋养植物的肥料。降低连接城市的北坡坡度,并设置公园、绿带与休憩活动设施后,矿坑向城市敞开,承担公共服务、休闲与观光的价值。结合都市计划,这些策略让沉寂的巨坑重新成为城市的心脏。